Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3914.15
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Jun 11, 2009     Gear leg priming and hardware assembly - (2.25 hours)       Category: Landing Gear
Today I test-fit the wheel/brake hardware onto the right gear leg, similar to the left leg.

Then I removed the brakes and wheels, and prepped and primed the gear legs. After they dried, I reinstalled everything. The gear legs are just about ready to bolt onto the fuselage. I still have to install some AN fittings on the brake housings, and torque and safety a couple of bolts, and they'll be ready to go.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.